Building Construction
- Residential buildings
- Commercial buildings
- Villas & townhouses
- Mixed-use developments
- Substructure to roof
- Main contracting

Visual from the Nashwati Company Profile 2026
Dubai Main Contractor
Nashwati Contracting L.L.C — Dubai Main Contractor. We take full responsibility from substructure to roof and handover.
Trade licence 1548897 · Dubai DET
Dubai-based main contractor delivering residential, commercial and high-rise projects across the UAE. We take full responsibility from substructure to roof and handover.
Full responsibility from substructure to roof and handover — backed by our own self-performed structural, rebar and formwork crews.



Conceptual illustration of the villa construction process. It does not depict a specific Nashwati Contracting project.
01
Substructure to roof · Main contracting
The plot is surveyed, set out and secured — the starting point for full responsibility from substructure to roof and handover.
Stage 01: Prepared site
Conceptual illustration of a high-rise structural sequence. Nashwati’s documented role on the 62-floor DAMAC Volta Tower was steel fixing & shuttering (client / main contractor: RCC Dubai LLC).
01
Rafts & foundations
A reinforced raft spreads the load of the tower into the ground.
Stage 01: Raft foundation
| No. | Project | Client / Main contractor | Scope |
|---|---|---|---|
| 01 | DAMAC Volta Tower — 62 floors | RCC Dubai LLC · Developer: DAMAC | Steel fixing & shuttering |
| 02 | Cloud Tower — twin 34-floor towers, JVT | Developer: Tiger | Steel fixing & shuttering |
| 03 | Emaar Dubai South — 728 townhouses (2025)Greenville 1 & 2, Greenpoint & Greenpoint 2 | Pivot Engineering · Employer: Emaar Dubai South · Engineer: Al Gurg | Shuttering & steel fixing, foundations to slabs |
| 04 | DAMAC Riverside — Marine 001, 002 & Indigo 001 (2026) | Naresco Contracting | Steel fixing incl. cutting & bending |
| 05 | DAMAC Hills 2 — ELO 1 (2025) | Draieh Contracting · Front Line Investment | Formwork & rebar — raft, columns, slabs |
| 06 | Al Shirawi — Project CD0006 (2026) | Al Shirawi Contracting, Civil Division | Raft, retaining, shear & core walls, slabs |
DAMAC Volta Tower — 62 floors
Cloud Tower — twin 34-floor towers, JVT
Emaar Dubai South — 728 townhouses (2025)
Greenville 1 & 2, Greenpoint & Greenpoint 2
DAMAC Riverside — Marine 001, 002 & Indigo 001 (2026)
DAMAC Hills 2 — ELO 1 (2025)
Al Shirawi — Project CD0006 (2026)
Some projects were delivered under the former name Alass Almtynh Technical Services, same licence.
Business Bay — DAMAC
Specialist package
Al Wasl
Specialist package
JVC — Integra Prime
Specialist package
From 62-floor towers to 728-townhouse communities.
Active sites in Dubai South, Saih Shuaib, Business Bay, Al Wasl and JVC.
The Managing Director is directly involved in site and commercial decisions.
DAMAC, Emaar, Azizi and Dubai South; main contractors incl. DAMAC, Dagasta, Nesto, Pivot, Naresco.
Clear focus on programme, cash flow, contract risk and variations.
Built for repeat relationships, not one-off jobs.
Founder & Managing Director
Founder & Managing Director
Civil Engineer
Putting the family name on the company is a promise of personal accountability: every project carries the founder’s own name and reputation, and every client deals directly with the owner — not a middle layer. The solid foundations stay; the name now stands behind them.
“We don’t just build structures — we build trust, one floor at a time.”
Speak directly with the Managing Director about your project — from foundation to handover.
Building Today · Developing Tomorrow